6. Lowering into ditch
Installation Timeline: 0 hours 22 minutes Lining up pipe ends. | |
|
7. Setting and leveling
Installation Timeline: 0 hours 27 minutes Setting base - assembling coupling in place. | |
|
8. Clamping coupling in place
Installation Timeline: 0 hours 37 minutes After coupling installed sling is removed. | |
|
9. Backfill and hand tamp complete
Installation Timeline: 0 hours 52 minutes | |
|
10. Rip Rap and sod to complete.
Total install time: 1 hour 07 minutes Including backfill and compaction Photo shows: Sod replacement took place following the above timeline. |